← MethodologySF-INFO-004
Operational Assurance Lifecycle
Operational Assurance is not a one-time event — it is a lifecycle. Assessment establishes the baseline. Remediation closes the gaps. Validation confirms the fix held. Ongoing measurement confirms it continues to hold. The lifecycle keeps wireless infrastructure aligned with operations over time.
Assess
Engineering-grade measurement establishes the true operational baseline. Not assumptions — evidence.
Remediate
Root-cause fixes, not workarounds. Changes are designed to eliminate the underlying deficiency.
Validate
Post-remediation measurement confirms the fix performed as designed in the live environment.
Monitor
Periodic validation catches drift before it reaches operations. Assurance documented over time.

